|
Maintenance
Procedures
01 - Operating Impact Gun
02 - Air Powered Hand Tools
04 - Lead Freeing Storage Tanks
05 - Pressure Testing
07 - Safe Use of Compressed Gas
08 - ARC Welding
10 - Personnel Baskets
11 - Welding Patches in Tank Bottoms
12 - Lifting Heavy Loads over Process Equipment
14 - Safety Relief Valve Shop Procedures
15 - Disinfecting Water Mains
16 - Conversion Gasket Installation
17 - Job Plan for Rebuilding Jerguson Gage Glasses
18 - Mechanical Work on Cooling Towers
19 - Use of the North Wash Pad
020 - Rail Operations and use of Car Breaks
021 - General Railroad Safety Rules
022 - Railroad Radio Communication
023 - Installing Safety Cables on Chain Wheel Operators
024 - Temporary Support of Floating Roof Tanks
025 - Leak Repairs
026 - Fixed Ambient Air Monitors
027 - MH #1 Sewer pH Probe
029 - Motorized Crane on Public Roadway
030 - Use of Pressure Rated Line Blanks
031 - Portable Ladder Inspection
032 - Use of Flexible Metal Hoses
033 - Routine Analyzer Maintenance
034 - Tools
035 - Extraction & Insertion of Exchanger Tube Bundles
036 - Condition Monitoring Audit Process
037 - Cutting and Removal of Unidentified Abandoned Lines
039 - Maintenance Shops Safe Work Practices
040 - Leak Sealing Procedure
042 - Maintenance Buildings Evacuation
043 - Manual Handwheel Operation of Dynatorque Operators on Furnace Dampers
044 - Facilities Maintenance Safe Work Practices
047 - Cranes And Lifting
• Lift Plan
• Lift Near Electrical Hazards Form
• Lifting Supplementary Certificate
Site Engineering Authority
|